Projects involving foreshore or marine development require approval from the Committee for Marine Projects (COMET).
The following project proposals must be submitted to the Committee for Marine Projects (COMET) of the Maritime and Port Authority of Singapore (MPA) for consideration:
1. Construction, installation, extension, additions and alterations of wharves, jetties, piers, slipways, dry docks, graving docks, ramps, fixed platform, bunds, shore protection, retaining walls, breakwaters and outfall/intake structures.
2. Installation of floating pontoons, floating docks, floating restaurants and accommodation barge.
3. Marine recreational facilities.
4. Fish farms.
5. Residential and other facilities/structures affecting the foreshore areas.
6. Reclamation works.
7. Submarine pipelines and cables.
8. Dredging and dumping works.
9. Marine Soil Investigation.
10. Demolition of foreshore/marine structures.
11. Dumping of dredged materials at sea dumping grounds.
When submitting the project proposals to COMET of MPA, the applicants are required to state:
Attention to Capt Pang Yock Foo.
COMET will normally require 3 weeks to process and reply the applications. The requirements and conditions imposed by MPA will vary depending on each project proposal.
The general requirements for foreshore development projects are as follows:
Please contact Capt Pang Yock Foo (Tel: 6325 2369) E-mail - Yock_Foo_PANG@mpa.gov.sg for any queries.